Awarded Projects 2016

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam.

2016

awarded projects

Despite the huge uncertainty surrounding Brexit and lowering oil prices, 2016 has been a busy year for our team. Please see below a list of current and completed tasks awarded to Flow Control in 2016:

A total of 366 manual and actuated valves to Saudi Aramco standards for the Manifa II Project. Engineering by Sepco (China).

From DSME (Doosan Korea) a total of 680 valves for 8 LNG Carriers to 3.2 and 3.1 certification. Some for cryogenic service.

Petronas Malaysia approves valves for the Rapid Johor PP-HP Project. A total of 431 valves to be supplied during 2016.

Manual valves for the Mina Al-Ahmadi Refinery Project in Kuwait. Engineered by GE Oil & Gas for KNPC.

In excess of 100 manual valves for Spectra Energy, Canada.

Super duplex metal seated trunnion mounted ball valves for ZADCO, Abu Dhabi. This Chicago Bridge & Iron engineered Project is due for delivery early 2017.

[envira-gallery id=”12803″]

We're Here To Help!

Office

Cooper Drive, Springwood Industrial Estate, Braintree, Essex, CM7 2RF, United Kingdom

Call Us

01376 321 211